Some of our biggest days happen in about twenty minutes. A commercial rooftop unit (RTU) can weigh several thousand pounds, and getting it from the truck to the curb on the roof takes a crane, a rigging plan and a crew that has done it many times.
Before the crane shows up
Most of the work happens weeks earlier: confirming the curb dimensions with the general contractor, coordinating power and gas with our own electricians and plumbers, and scheduling the lift around the rest of the job site. Having all three trades in-house means one plan instead of three.
Lift day
The unit is rigged with a spreader bar so it hangs level, the area below is cleared, and a signal person stays in contact with the operator the whole way up. Once it lands, our team sets it, seals it and starts on the connections.
One company for the HVAC, the electrical and the plumbing means fewer handoffs and fewer surprises.
Commercial work since 1999
We've been a commercial HVAC and plumbing contractor since 1999 on commercial, civic and school projects,. Have a project out to bid? Send us the details.